New: swept paths now use Austroads AP-G34-23 design vehicles, B-doubles included. See what's new

Library

Waitaki District Council

What Waitaki District Council asks for when you lodge a Corridor Access Request, with the page each answer came from.

Region
Otago
Type
District council
Authority website
www.waitaki.govt.nz

This is our summary of what the authority publishes. Check the authority's own page before you lodge.

Lodging soon? Check your TMP with the Xuro Review Engine before it goes in. See the Review Engine

Submitting

Where to submit a CAR

Submitica (www.submitica.com). Create an account, then click create new application. Submitica is free to use, but the council's fees apply to the CAR.

Sources (1)
When a CAR is needed

A CAR is needed to carry out work within the road corridor (boundary to boundary), including excavating, drilling and resurfacing, placing any pipe, duct, pole, cabinet or other structure, drainage work, and services such as gas, power and cables. The list is "not limited to". Minor works are domestic service connections and/or works up to 1 square metre that do not disrupt pedestrian or vehicle traffic; major works are excavations over 1 square metre taking under 21 days; project works exceed 21 days. Minor or emergency works already done in the past seven days are notified retrospectively.

Sources (1)
TMP submission

A TMP must also be submitted with the CAR, through Submitica; it can go in at the same time as the CAR application. Anyone not experienced in preparing TMPs can use one of the listed local traffic management contractors. No file format is published.

Sources (2)
Standard accepted

NZGTTM, which the council says replaces the CoPTTM and has been effective in the Waitaki district from 1 January 2026.

Sources (1)
Local conditions

Not found yet

Fees

2026/27 schedule, GST included. Single utility works access permit and TMP $710, single non-excavation TMP $310, global utility works access permit and PARS $1,910, non-excavation PARS $1,910, subsequent TMP or PARS to an existing application $150, re-inspection $310 (re-inspection of activities found not meeting requirements is $350 plus time and disbursements). Temporary road closures for events: private or commercial $400 and public $250 per single event, plus $50 for each extra road; late applications add $150.

Sources (1)
Processing time

Submit a CAR at least 5 working days before minor works start, and at least 15 working days before major works and project works. The council notes a CAR may need extra information before it can proceed. No separate TMP processing time was found.

Sources (1)

Closures and road space

Road closure application

The fee schedule has temporary road closure charges for events (private or commercial, public, extra roads, and late applications). No separate closure form, lead time or public notice period was found on the pages checked.

Sources (1)
Extra forms with a CAR

Other roading application forms the council lists.

  • Application to Occupy Road Corridor (online form)

    Covers Occupying part of the road corridor

    Applies when Listed as a quick link on the CAR page; the page does not say which jobs it is for

    Open the form

  • Application to Place Private Pipelines within Road Corridor

    Covers Placing a private pipeline in the road corridor

    Applies when A private pipeline is to be put in the road corridor; the fee schedule lists a private pipeline or utility permit

    Open the form

Sources (2)
Road space booking

Not found yet

Temporary speed limits

Not found yet

Events

Not found yet

People to notify

Public transport

Not found yet

Other notifications

Not found yet

Contacts and restrictions

Corridor access team

Council service desk: [email protected], 03 433 0300. A dedicated corridor access team inbox was not found.

Sources (1)
Working hours and restrictions