New: swept paths now use Austroads AP-G34-23 design vehicles, B-doubles included. See what's new

Library

Tasman District Council

What Tasman District Council asks for when you lodge a Corridor Access Request, with the page each answer came from.

Region
Tasman
Type
Unitary authority
Authority website
www.tasman.govt.nz

This is our summary of what the authority publishes. Check the authority's own page before you lodge.

Lodging soon? Check your TMP with the Xuro Review Engine before it goes in. See the Review Engine

Submitting

Where to submit a CAR

Submitica (submitica.com): create an account, create an application, choose the type, and enter the location, dates, contacts, activity details and TMP information. Sending the application is free.

Sources (1)
When a CAR is needed

A CAR is needed for any work or activity on a road, footpath or berm, or that affects people using it: any physical works in the road corridor, and events or activities that affect normal operation of the road, footpath or berm. Excavation covers digging, directional drilling, resurfacing, pipes and ducts, access ways and opening manhole or chamber covers. Non-excavation covers safety fencing, scaffolding, cranes and tree work, and TMPs for non-intrusive works. Emergency works needed within the day are applied for after the event.

Sources (1)
TMP submission

The TMP is entered in Submitica with the CAR. It must be prepared by a qualified Site Traffic Management Supervisor (STMS) and show the location and type of work and the start and finish dates. The council also asks for a detailed site plan and as much detail as possible about the activity. Work cannot start until the signed permit and TMP have been emailed back to you.

Sources (1)
Standard accepted

CoPTTM. The council's page (last modified 4 May 2026) says temporary traffic management must comply with NZTA's Code of Practice for Temporary Traffic Management. No NZGTTM position or switch date was found.

Sources (1)
Local conditions

All work in the Tasman road corridor must comply with the Nelson Tasman Land Development Manual, and all works have a two-year defect liability period. On completion, upload a photo of the finished reinstatement in Submitica and notify works complete.

Sources (1)
Fees

From 1 July 2026, GST included. Standard excavation CAR including a TMP and 2 inspections $687 (includes one TMP revision; $155 extra if the TMP still falls short of standards after a revision). Non-excavation CAR/TMP for one-off events such as parades $344 initial submission (includes one revision; $155 extra after that). TMP revision after acceptance $78. Generic TMP $458 (covers 2 hours, then $234 per hour); inspection and mobile-only generic TMP $234. Penalty for working without approval: the CAR fee plus $518. Event road closure: $596 application fee plus actual staff costs and expenses, and a $2,590 refundable deposit.

Sources (1)
Processing time

Excavation applications 15 working days ahead, non-excavation applications 5 working days ahead. For temporary road closures, the council asks for approval to be sought ideally at least 60 days before, and typically at least 42 days from the first advertised submission date are needed under the Local Government Act, more if submissions come in.

Sources (2)

Closures and road space

Road closure application

Yes. Apply to the council (application form on its website) before closing the road, ideally at least 60 days ahead, with the prescribed fee. The council places a first advertisement inviting submissions and objections, then a second with the closure hours and detours. The applicant provides liability insurance of at least $2,000,000, a bond if prescribed, tells Police and emergency services, confers with adjacent property owners about their access, and supplies a TMP for council acceptance. State highways are NZTA's.

Sources (1)
Extra forms with a CAR

Not found yet

Road space booking

Not found yet

Temporary speed limits

Not found yet

Events

Events such as parades, sporting events or music events sometimes need a TMP; a non-excavation CAR/TMP is priced for one-off events. An event closing a road follows the temporary road closure process, ideally lodged at least 60 days ahead.

Sources (2)

People to notify

Public transport

Not found yet

Other notifications

For a road closure, tell the local Police station and emergency services (including the Emergency Call Centre), and confer with adjacent property owners about their access. The council advertises the closure twice.

Sources (1)

Contacts and restrictions

Corridor access team

Council: [email protected], 03 543 8400 (given for traffic management plan enquiries).

Sources (1)
Working hours and restrictions

Not found yet