What Selwyn District Council asks for when you lodge a Corridor Access Request, with the page each answer came from.

Region
Canterbury
Type
District council
Authority website
www.selwyn.govt.nz

This is our summary of what the authority publishes. Check the authority's own page before you lodge.

Lodging soon? Check your TMP with the Xuro Review Engine before it goes in. See the Review Engine

Submitting

Where to submit a CAR

myWorksites (online).

Sources (1)
When a CAR is needed

A CAR is required for any activity in the road corridor. Works that do not involve ground disturbance count as non-excavation activities. Works over 10 working days, and all subdivision-related activities, fall in the project category. Emergency works by contracted maintenance and utility providers are an exception.

Sources (1)
TMP submission

The council asks for a TMP that suits the site and activity and is aligned with the NZGTTM. All documents must be portrait PDFs, each no larger than 15 MB. TMP approval is required before any TTM is placed in the road corridor.

Sources (1)
Standard accepted

NZGTTM. The council says temporary traffic management must be planned, implemented and managed in accordance with the NZGTTM. No CoPTTM position was found.

Sources (1)
Local conditions

Evidence of meaningful engagement with affected residents and other impacted stakeholders must be provided. A contractor may be removed from the road corridor in the situations the council lists. A Works Completion Notice is submitted when the works are finished (a template is on the council's page).

Sources (1)
Fees

Fees apply from 1 July 2026. Non-excavation CAR and TMP $106, small excavation CAR and TMP $428, large excavation CAR and TMP $857. A road closure application is $2,010 in addition to the CAR and TMP fee. Road space bookings relating to a global CAR $59. Non-conforming or dangerous audit inspection and review $1,073.

Sources (1)
Processing time

Minimum processing times: project CAR/TMP 10 working days, road closure 10 working days, event road closure TMP 10 working days, road space booking (under a global CAR only) 5 working days. The council says the time to process an application depends on the request.

Sources (1)

Closures and road space

Road closure application

This applies to any works requiring full closure of the road corridor to the public. The council's minimum processing time for a road closure is 10 working days, and a road closure application fee is charged in addition to the CAR and TMP fee. Public notification by the council is in addition to any agreed communication measures such as letter drops and on-site signage, which remain the contractor's responsibility. No separate road closure form was found.

Sources (2)
Extra forms with a CAR

Forms the council publishes for corridor work.

  • Road Space Booking (RSB) form

    Covers Booking road space under a global CAR

    Applies when Working under a global CAR; road space bookings must be used before any works start

    Open the form

  • TMP Extension form

    Covers Extending an existing TMP

    Applies when An existing TMP needs an extension

    Open the form

  • Works Completion Notice

    Covers Telling the council the works are finished

    Applies when On completion of the works

    Open the form

Sources (1)
Road space booking

Road space booking is carried out under a global CAR only, and bookings must be used before any works start. The fee is $59 per booking and the minimum processing time is 5 working days.

Sources (2)
Temporary speed limits

Not found yet

Events

Event road closure TMPs have a 10 working day minimum processing time. Community and sporting events that meet the council's definition are not charged for the CAR and TMP.

Sources (2)

People to notify

Public transport

Not found yet

Other notifications

Stakeholders to be consulted include affected residents, businesses, property owners, public transport operators, emergency services, schools, utility operators and, where applicable, the Road Controlling Authority. Contractors must obtain relevant service plans and arrange for the location of underground services.

Sources (1)

Contacts and restrictions

Corridor access team

Corridor manager team: [email protected].

Sources (1)
Working hours and restrictions

Road works are not permitted on specified roads during peak traffic periods, Monday to Friday, except by prior written approval from the Road Network Coordinator. The morning peak is 7:00 to 9:00 am. All works must cease at least 45 minutes before and after school drop-off and pick-up times, and footpaths must remain open within 100 metres of any school, high school or preschool. Which roads count as specified was not found.

Sources (1)