What Palmerston North City Council asks for when you lodge a Corridor Access Request, with the page each answer came from.

Region
Manawatū-Whanganui
Type
City council
Authority website
www.pncc.govt.nz

This is our summary of what the authority publishes. Check the authority's own page before you lodge.

Lodging soon? Check your TMP with the Xuro Review Engine before it goes in. See the Review Engine

Submitting

Where to submit a CAR

Not found yet

When a CAR is needed

Not found yet

TMP submission

Not found yet

Standard accepted

Not found yet

Local conditions

Trenching must follow the most recent National Code of Practice for Utility Operators' Access to Transport Corridors (which takes precedence) and the council's Engineering Standards for Land Development, section 1.27 (NZS/AS3725, with compaction testing records provided before surface reinstatement).

Sources (1)
Fees

1 July 2026 to 30 June 2027, GST inclusive, invoiced at the end of each month. Standard one-off site-specific CAR: $142 administration plus $100 reinstatement fee (first 20m of trench opening, covers two reinstatement inspections), $242 in total. Generic CAR for low-risk, low-complexity work: $285 administration plus $100 inspection fee, $385 in total. Additional reinstatement inspection $51: for every 100m of trench opening beyond 20m on a standard CAR, or per visit on a generic CAR. The application fee covers the TMP and the approval request for any work in the road reserve.

Sources (1)
Processing time

Not found yet

Closures and road space

Road closure application

Not found yet

Extra forms with a CAR

Not found yet

Road space booking

Not found yet

Temporary speed limits

Not found yet

Events

Event organisers who need a TMP for their event pay an administration fee for the plan. The council points organisers to a traffic management company to learn about the process. No separate event road closure process was found on the pages checked.

Sources (1)

People to notify

Public transport

Not found yet

Other notifications

Trench inspections are booked with the council's road maintenance contractor: 7 days' notice for the first inspection and 24 hours' notice before asphalting and surfacing. For a generic CAR, tell the corridor access manager about each specific site 7 days before work. Each road opening carries a two-year warranty.

Sources (1)

Contacts and restrictions

Corridor access team

Council: [email protected], 06 356 8199. No corridor access team inbox is published on the pages checked.

Sources (1)
Working hours and restrictions

Not found yet